The Borough Council of Kings Lynn and West Norfolk are required to undertake an Integrated SFRA and Water Cycle Study as an essential part of the pre-production/evidence gathering stages of the Local Plan and in preparation of the Sustainability Appraisal (SA). The Council is in the process of producing a New Local Plan (NLP) and this will require an update to the existing evidence base for the recently adopted Local Plan (March 2025). For this plan, the Council produced a joint Level 1 Strategic Flood Risk Assessment (SFRA) with other Norfolk Authorities. A separate Level 2 assessment was also produced to inform the allocation of sites. A current Water Cycle Study exists, but this is now considered out of date and should form part of the wider SFRA review. A Surface Water Management Plan was produced in 2012, but this is now considered out of date and will be replaced by this SFRA review.
Ref: BCKLWN378,
Contract value: 74,704.00
Published: 28 May 2026, Receipt by: 19 Feb 2026
All suppliers that are registered with us receive email notifications of Public Sector tenders related to their area of business.