Northern Industrial Link Road (NILR) Detailed Design is one of five schemes in the Northen Industrial Link Road project (NILR). This scheme aims at re-routing traffic from the town centre by linking two adjoining traffic routes - Hundred Road and Longhill Road which are currently separated via a small strip of private land. The scheme will provide an integrated 1.9km traffic route by upgrading Hundred Road to a two-way carriageway and connecting it to the existing two-way carriageway on Longhill Road. The scheme will also provide a full-length cycle way across the route on Hundred Road. The junction of Longhill Road and Elm Road (B1101) will also be upgraded to a roundabout
Ref: CCC001-DN744396-51156527,
Samantha Hastings
samantha.hastings@cambridgeshire.gov.uk
New Shire Hall
Alconbury Weald
Huntingdon
PE28 4YE
United Kingdom
+44 7700000000
https://www.cambridgeshire.gov.uk/
Contract value: 600000-600000
Published: 15 May 2025, Receipt by: 20 Feb 2025
All suppliers that are registered with us receive email notifications of Public Sector tenders related to their area of business.