Public Sector Network Tender Alert

 

390361-2012: UK-Banbury: boiler installations

Boiler installations. Design, supply, installation and commissioning of a circa 500 kw Woodchip Biomass boiler, buffer, fuel feed and fuel store at Bicester Leisure Centre.

Ref: TRN 20/12,

Contact:

Cherwell District Council
Bodicote House, White Post Road, Bodicote
Contact point(s): Joint Procurement Team, Cherwell District Council and South Northamptonshire Council
For the attention of: Ken Fowler
OX15 4AA Banbury
UNITED KINGDOM
Telephone: +44 295753749
E-mail: ken.fowler@cherwellandsouthnorthants-dc.gov.uk
Fax: +44 295221985
Internet address(es):
General address of the contracting authority: http://www.cherwell.gov.uk/
Address of the buyer profile: http://cherwelllive.cherwell.domain/finance/procurement/
Electronic access to information: www.businessportal.southeastiep.gov.uk
Electronic submission of tenders and requests to participate: http://www.cherwell.gov.uk/
Further information can be obtained from: Cherwell District Council
White Post Road
OX15 4AA Bodicote, Near Banbury
UNITED KINGDOM
Specifications and additional documents (including documents for competitive dialogue and a dynamic purchasing system) can be obtained from: The above mentioned contact point(s)
Tenders or requests to participate must be sent to: The above mentioned contact point(s)

Contract value: Cherwell District Council wishes to select an experienced biomass system installer to undertake the design, supply, installation and commissioning of a c. 500 kW biomass system, related ancillary equipment and fuel storage, fuel reception and fuel transfer, and integration with existing M&E services for Bicester Leisure Centre. Products should comply with EN45011.Bicester Leisure Centre is principally a swimming pool complex, comprising a main pool, smaller training pool, sports hall, squash courts, fitness gym, crèche facilities and a bowling alley. The original sports centre building was constructed in 1974. In June 2009 the building was fully reopened following an extensive refurbishment programme.Two gas fired boilers located in a boiler room attached to the building currently provide pool heating, space heating and hot water services to the complex.The current heating system is natural gas (1 024 kW); annual consumption in the 2010-11 heating season was 2 492 865 kWh (based on 85 % efficient boilers demand is estimated at 2 118 935 kWh). Hot water and swimming pool demand is estimated at 1 620 000 kWh and space heating at 500 000 kWh per annum.The available power supply at the Centre is 3-phase.Estimated value excluding VAT: Range: between 200 000 and 300 000 GBP

Published: 8 Dec 2012, Receipt by: 8 Jan 2013