A call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020). To provide a connection between the new Kebbell Homes development and the existing footway to the south. Works include 45-50m of footway, 4 new dropped kerb tactile crossing points, and removal of an existing dropped kerb tactile crossing. This work has been requested by HCC HDP and will form part of the walking and cycling strategy currently being developed in Whitehill & Bordon.
Gen4@hants.gov.uk
The Castle
WINCHESTER
SO238UD
England
Contract value: 51783.3
Published: 2 Feb 2022, Receipt by: 20 Dec 2021