Public Sector Network Tender Alert

 

Bilston Glen - Provision of Temporary Mine Water Treatment Scheme

The services being provided under this contract are the provision of the infrastructure to capture and transfer flows from the adit to a temporary treatment scheme, designed to be suitable for the onward transfer of water to a permanent location and the design, supply and installation for a temporary mine water treatment system. Coal mine water is currently discharging into the River South Esk from the Old Fordell Adit. Groundwater levels have been rising in the area since mining ceased in 1989 and The Coal Authority (TCA) has been monitoring this discharge for a number of years. Recently, the water quality of this discharge has deteriorated and is now impacting the River South Esk. It is anticipated that a temporary plant will utilise HDS technology , however other technologies may be considered where it can be demonstrated that they have suitable reference experience on coal mine waters and can be deployed within acceptable timescales. Successful tenderers will enter into a contract in accordance with the NEC4 Engineering and Construction Contract and additional conditions of contract. To express an interest in this opportunity and to access the complete suite of tender documents tenderers are invited to register on our tender portal at https://inbye.coal.gov.uk/s2c/ Once registered you will receive an email with your unique password and once logged in you can view the open opportunity.

Contact:

Paul Beales
PaulBeales@coal.gov.uk
200 Lichfield Lane
MANSFIELD
NG184RG
England
01623637135

Contract value:

Published: 22 Jun 2020, Receipt by: 3 Aug 2020